项目管理师模拟试题6章

发布时间:2021-10-14
项目管理师模拟试题6章

项目管理师模拟试题6章 第1章


142 Which of the following can be tracked using the WBS?

A. time

B. cost

C. performance

D. scope

E. None of the above

正确答案:D


55 In a fishbone diagram, the effect you are concerned about is placed:

A. at the right-hand end of the spine.

B. at the end of the diagonal line (i.e. "fin").

C. on a branch of a fin.

D. at the left-hand end of the spine.

E. None of the above

正确答案:A


变更控制系统不包括下列哪项?( )

A.文书工作

B.跟踪系统

C.授权许可级别

D.成功谈判的激励

正确答案:D


102 The major disadvantage of a bar chart is:

A. Lack of time-phasing.

B. Cannot be related to calendar dates.

C. does not show activity interrelationships.

D. Cannot be related to manpower planning.

E. Cannot be related to cost estimates

正确答案:C


● The purpose of configuration management is to:

A insure drawings are updated

B control change throughout the project

C control change during the production only

D generate engineering change proposals

E inform. the project manager of changes

正确答案:B


在项目沟通管理程序中,行政收尾包括验证并将项目结果形成文件实现客户正式接收项目产品。行政收尾工序

产生的输出包括:

a. 项目档案,正式验收,取得的经验

b. 要求变更,项目纪录,取得的经验

c. 取得的经验,执行情况报告,变更要求

d. 沟通管理计划,变更要求,项目档案

e. 以上均不是

正确答案:A
59.  a.  Project archives, formal acceptance, and lessons learned
The project archives consist of a complete set of indexed project records. Formal acceptance
is documentation showing that the customer has accepted the product of the project. Lessons
learned document the causes of variances and the corrective actions chosen and provide a
valuable resource for similar future projects of the performing organization.


139 The project charter is a document designed to tell _____ exactly what the project entails.

A. The project manager

B. The project office

C. The project team

D. The project sponsor

E. Anyone associated with the project

正确答案:E


Which of the following is referred to as sunk cost:

A . management reserve

B . contingency fund

C . cost budgeted for construction under water

D . expended funds over which there is no further control

E . forecasted budget over-runs

正确答案:D


项目管理师模拟试题6章 第2章


92 Company expenses such as auditing costs, supervision, office supplies, building rent and maintenance are elements of the:

A. Capital budgeting process.

B. Overhead rates.

C. Contracts and administration costing system.

D. Fringe benefits packages.

E. None of the above

正确答案:B


47 A project can best be defined as:

A. Series of non-related activities designed to accomplish single and multiple objectives.

B. Coordinated effort of related activities designed to accomplish a goal without a well-established end point.

C. Cradle-to-grave activities which must be accomplished in less than one year and consumes human and non-human resources.

D. Any undertaking with a definable time frame, well-defined objectives, and consumes both human and non-human resources with certain constraints.

E. All of the above.

正确答案:D


21 The project charter is a document designed to tell _____ exactly what the project entails.

A. The project manager

B. The project office

C. The project team

D. The project sponsor

E. Anyone associated with the project

正确答案:E


下列哪项是采购计划编制的输出?

A、 合同

B、 采购文件

C、 工作说明书

D、 自制或外购决策

正确答案:C


106 Which of the following is not a definition to determine a product's ability to operate as intended? A. distance

B. performance

C. function

D. condition

E. All are definitions

正确答案:E


● The project scope/charter baseline includes:

A Summary of background conditions defining the project.

B Organization, authority and responsibility relationships.

C Functions to be performed.

D Resource requirement schedule including time estimates.

E All of the above.

正确答案:E


你已经被任命为一个新项目的经理,必须编制一份项目计划。为了给项目提供整体框架,你决定准备一个工作分解结构(WBS)来说明工作的复杂程度和工作量的大小。但是现在没有现成的WBS摸板可供利用。为准备WBS,你做的第一步是:( )

A.为每个项目的交付成果确定成本和持续时间

B.确定项目的主要交付成果

C.明确每个项目交付成果的构成

D.明确要执行的主要任务

正确答案:B


12 The identification, definition, and selection of the project objectives as well as the best approach to achieving the project objectives are indentified in the _____ phase of the project but first documented in the project _____.

A. Conceptual, charter/baseline.

B. Conceptual, master schedule.

C. Development, charter/baseline.

D. Development, master schedule.

E. Development, masterplan

正确答案:A


项目管理师模拟试题6章 第3章


8 Present value measures

A. the value to us today of future cash flows.

B. the rate of return on an investment when we take account of cash inflows and outflows

C. the current estimates of our project budget

D. the dollars worth of work accomplished as of today

E. All of the above

正确答案:A


以下哪些工具或技术用于信息发布过程

A、 沟通管理计划、项目计划、信息发布系统

B、 信息发布系统、信息检索系统、绩效报告

C、 沟通技巧、信息检索系统、信息发布系统

D、 沟通技术巧、工作结果、状态报告

正确答案:C


超前和滞后是:

A、 用于进度计划编制过程的工具和技术。

B、 活动历时估算过程的输入

C、 进度计划编制过程的输入

D、 活动排序的工具和技术

正确答案:C


114 History has shown that project managers can be trained in a combination of ways. Which method is usually preferred by most companies?

A. Experiential learning, on-the-job

B. Formal education and special course (degreed programs)

C. Professional activities, seminars

D. Individual readings

E. None of the above

正确答案:A


● In crashing a task, you would focus on:

A As many tasks as possible.

B Non critical tasks.

C Accelerating performance of tasks on critical path.

D Accelerate performance by minimizing cost.

E A and D.

正确答案:C


一个人估计她回家最可能的情况是花1小时时间,她又进一步推算,在最快的情况下回家要花45分钟,而最慢也顶多用1小时45分钟.基于这样的估计,这个人回家所花的时间的标准差是多少?

A、10分钟

B、15分钟

C、50分钟

D、60分钟

正确答案:A


大量使用-----沟通最有可能协助解决复杂的问题( )

A.口头

B.书面

C.正式

D.管理信息系统

正确答案:B


36 When items to be purchased for a project are specified by performance characteristics:

A. paperwork is greatly reduced

B. the supplier is held liable for the operation of the item

C. the supplier is held liable for the maintenance of the item

D. the supplier is held liable for that the item meets the design, dimensions, and tolerance specifications.

E. B and D only

正确答案:B


项目管理师模拟试题6章 第4章


在项目的执行期间,发生了大量的变更,项目经理应该如何处理?

A、 坐等所有变更公诸于众,然后印制新的进度计划

B、 进行必要的变更,但是保持进度基准计划

C、 进行必要的变更

D、 在进行任何变更前和管理层沟通

正确答案:B


当项目经理进行谈判时,非口头沟通技术:

A、 不太重要

B、 非常重要

C、 涉及到成本和进度目标时才重要

D、 涉及到异文化时才重要

正确答案:B


Forecasting human resource requirements necessitates making predictions about both the supply and demand of human resources. Which of the following is not a method used to forecast the demand for human resources?

A . Delphi Method

B . Regression Analysis

C . PERT Charts

D . Staffing Tables

E . Time Series Analysis

正确答案:C


The process of choosing/documenting the best approach to achieve the project objectives is part of:

A.The scope baseline.

B.Scope authorization

C.Scope definition

D.Scope planning.

E.All of the above.

正确答案:D
D


31 An individual who is working on the satisfaction of physiological needs has essentially satisfied which needs?

A. Safety

B. Empowerment/authority

C. Esteem

D. Self-actualization

E. None of the above

正确答案:E


39 Quality and _____ are directly related.

A. productivity

B. cost overruns

C. scope control

D. Pareto diagram

E. None of the above.

正确答案:A


项目成功依赖于大量的相互关联的因素,包括时间、成本以及范围控制。然而,任何一个项目的成功主要依赖于

A、 客户接受

B、 客户满意

C、 客户在满足自己的需要的基础上有一定的妥协

D、 超过客户最初设定的项目范围

正确答案:B


A project manager trying to communicate accurately to the team should use:

A the language of the team members

B the language of the project manager

C non-verbal methods

D written memos

E All of the above.

正确答案:A


项目管理师模拟试题6章 第5章


JIT这个概念意味着:( )

A.零缺陷

B.零库存

C.100%检验

D.属性抽样

正确答案:B


投入的倾听需要理解对方的观点.为展示投入的倾听技巧项目经理应该:

a. 模仿信息的内容

b. 探查内容进而建议

c. 评估内容继而建议

d. 改述内容并反映自己的观点

e. 以上均不是

正确答案:D
57.  d.  Rephrase the content and reflect the feeling
Empathic listening requires seeing the world the way the other person sees it, with the goal of
understanding that person’s views and feelings. Unlike sympathetic listening, empathic
listening contains no element of value judgment.


177 Which type of contract requires that the buyer keep the tightest labor/material cost control?

A. Cost Plus Incentive Fee

B. Cost Plus Percentage of Costs

C. Cost Plus Fixed Fee

D. Firm Fixed Price

E. Firm Fixed Price Plus Incentive

正确答案:B


The scope baseline/project charter is prepared by the:

AProject manager

BProject manager and project office

CProject manager, project office and functional team

DProject manager, project office, functional team and project sponsor

EProject manager, project sponsor and customer/user

正确答案:E
E


he five major cost categories of quality are _____ .

A . prevention, appraisal, internal failures, external failures, and equipment (measurement and test).

B . specifications, QA programs, QC programs, parts rejected and parts returned

C . Staffing, Training, reviews, equipment and rejected goods

D . sampling, design considerations, manufacturing considerations, training and rework.

E . None of the above

正确答案:A


如果项目经理不关心个人目标而是关注关系问题,那么他采用的是哪类冲突解决方法?( )

A.得-失

B.屈服-失

C.失-离开

D.妥协

正确答案:B


● A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:

A Change the scope baseline

B Prepare a variance report

C Call a meeting of the configuration control board

D Change the project's objectives

E Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

正确答案:E


你的项目发起人要求你为项目进度风险进行一个蒙特卡罗分析。这个任务需要用到下列哪一部分内容?

A、 编制项目计划的方法

B、 项目执行的方法

C、 项目管理信息系统

D、 项目经验教训数据系统

正确答案:A


项目管理师模拟试题6章 第6章


项目小组成员在哪种情况下的时候,一个跨行业学科的项目成功的几率增大

A、项目小组成员关注问题的解决

B、对管理层的要求敏感

c.关注项目的个别活动

D、关注客户需求

正确答案:A


Which of the following would most likely not be an essential objective of a project team kick-off meeting

A . Create a project technology master plan

B . Get team members to know one another

C . Identify project problem areas

D . Obtain individual and group commitments

E . Identify the project coordinator

正确答案:A


● The time necessary to complete a project is called the _______ of a project.

A Implementation Time

B Life Cycle

C Operation Time

D Critical Path

E Completion Phase

正确答案:B


Using the situation stated in the Special window, what is the total price variance for direct material?

A . ¥140.00

B . ¥736.00

C . ¥0.02

D . ¥-350.00

E . ¥5,850.00

正确答案:B


德尔菲技术是特别有用的方法,用于确定风险以便——( )

A.用图形的方式为决策者提供一系列决策选择

B.定义特定变量发生的可能性

C.减少分析的偏见并避免任何一个人对结果有不当影响

D.帮助将决策者对待风险的态度考虑在内

正确答案:C


81 A project manager believes that the best way to manage is to form. a good, harmonious working relationship with the team, and high performance will follow. The project manager could be defined as a _____ manager.

A. 1,9

B. 9,1

C. 1,1

D. 9,9

E. 5,5

正确答案:A


线性规划可以作为哪类项目筛选标准的实例?

A、 强制最优化

B、 对比法

C、 利益评估

D、 影响分析

正确答案:A


长期合同是项目质量管理的一个重要方面,因为长期合同( )

A.激励卖主进行质量保证

B.利用收益-成本分析来提高质量

C.通常会降低成本,提高生产力

D.提供强制性的审核

正确答案:A